Cost of downtime

What one hour of CNC downtime costs: the math, line by line

The three-part formula almost everyone gets wrong (the one you forget is lost production), a full worked example at €180/hour, and the three mistakes that skew the count.

CENTRIQ Editorial2 min read

Asking what an hour of machine downtime costs is the right question asked the wrong way. The answer is not a number: it is a three-part formula, and the largest part is almost always the one nobody includes.

Part one: the hourly cost of the stopped machine. For a mid-range CNC machining centre a common industry figure is €180/hour; a robotic cell around €150, an injection press €160. These are sector values — replace them with your own (depreciation, lease, fixed energy).

Part two: the technician. If the intervention absorbs a technician at €55/hour for three hours of searching, that is €165 producing nothing: searching for the procedure is downtime in full, even if the machine could already be restarted.

Part three, the biggest: the production the line does not make while stopped. If the line is worth €300/hour of output — often tied to orders already taken — an 8-hour stop burns €2,400 of deferred revenue before touching the machine. In our full worked example (CNC at €180/h, technician €55/h, production €300/h), an 8-hour stop costs €4,280. That is the number used in our home-page simulator, declared as an illustrative estimate.

The first classic mistake is counting machine + technician only: you understate by 50-60%. The second is using the average hour instead of the specific hour: a stop during a shift change or at month-end is not worth the same as a dead night hour. The third is forgetting recurring stops: three 2-hour stops hurt more than one 6-hour stop, because each restarts the line's learning curve.

What does documentation have to do with it? The part of downtime you can compress without capital expenditure is the time between the code on the display and the right procedure in the technician's hands. When the exact manual page arrives within minutes instead of after phone calls and searches, our pilot's estimate indicates a 35% reduction in lookup time — in the example above, €1,498 recovered per event. It is an illustrative estimate the pilot programme measures case by case: no assumed results.

To run the numbers with your own values, the interactive simulator on our home page does it in ten seconds. To see where your service team's hours actually go, the interactive demo shows the full path: from the request to the manual page, with the technician's approval.

Frequently asked questions

How much does one hour of CNC downtime cost?

With typical sector values (machine €180/h, technician €55/h, lost production €300/h) one stopped hour costs about €535. Compute it on your own costs: lost production is almost always the largest part.

Why count lost production in downtime?

Because while the line is stopped it does not make what it would have made, often tied to confirmed orders. It is deferred but real cost: in our example it exceeds the stopped machine itself.

How much downtime can documentation work remove?

Our pilot's illustrative estimate is a 35% reduction in procedure lookup time, when the exact manual page arrives within minutes citing document and page. The pilot programme measures the real value case by case.